OUR PROJECTS

projects

PT PUPUK KALIMANTAN TIMUR

Project Name : Dismantling, Fabrication/Repair and Installation Convection Section (12 Segment/Module) of Pabrik #5.

Location : PT. PKT – Bontang – Kalimantan Timur.
Year : 2022
General Scope :
1. Dismantling 12 Segment/Module.
2. Fabrication/Repair 12 Segment/Module.
3. Installation 12 Segment/Module

projects

PT. MANDAU CIPTA TENAGA NUSANTARA (MCTN)

Project Name : HRSG INSPECTION & MAINTENANCE SERVICES.

Location : PT. MCTN North Duri Cogen Area-11 Duri Field, Riau.
Year : 1 Oktober 2022 – 30 September 2025

General Scope :

  1. COMBUSTION INSPECTION (CI)
  2. MAJOR OVERHAUL (MO)
  3. HOT GAS PATH INSPECTION (HGPI)
  4. TUBE REPLACEMENT (RETUBING)
  5. DUCT BURNER INSPECTION & REFURBISHMENT
projects

PT KILANG PERTAMINA INTERNASIONAL – RU VI BALONGAN

Project Name : JASA PEKERJAAN REPLATING HOT SPOT CASING CO BOILER 15-B-101

Location : PT KPI – RU VI Balongan, Indramayu, Jawa barat
Year : 2022

General Scope :

  1. Replating Hot Spot Casing Module 1 & 2, Include Repair Refractory.
  2. Partial retubing module 1 dan 2 (total 400 Tube)
  3. Hydrostatic test.
  4. Smoke test.
  5. CO-Boiler box up.
  6. Start up, Include Refractory Dry Out (RDO) Steam Blow
projects

PT KILANG PERTAMINA INTERNASIONAL – RU VI BALONGAN

Project Name : Partial Retubing Catalyst Tube Hydrogen Reformer 22-f-101 Major Ta Ru Vi Balongan Tahun 2022
Location : PT KPI – RU VI Balongan, Indramayu, Jawa barat
Year : 2022

General Scope :

  1. Unloading-Loading Catalyst.
  2. Partial retubing 10pcs catalyst tube include pigtail & accessories.
  3. Cleaning & Replacement Gas Burner & Air Register Support
projects

PT KALTIM DAYA MANDIRI (KDM)

Project Name : Retubing Evaporator Bundles HRSG (5 Row).
Location : PT. KDM – Bontang – Kalimantan Timur.
Year : 2022
General Scope :

  1. Supply material Fin-tube & Header.
  2. Fabrication Evaporator Module (5 Row/ 10 Harp).
  3. Construction (Dismantlin & Install) Evaporator Module.
projects

PT. KALTIM METHANOL INDUSTRI (KMI)

Project Name : Repair SCC (Stress Corrosion Cracking) on HE 010-E09 & 030-E01 II .
Location : PT. KMI – Bontang – Kalimantan Timur.
Year : 2022

General Scope :

  1. HYDROGEN REMOVAL
  2. REPAIR TUBE PROTRUSION
  3. REPAIR TUBE SHEET CLAD
  4. REPAIR SCC ON CHANNEL CLAD
  5. REPAIR INLET & OUTLET NOZZLE 
 

projects

PT. SUMBER SEGARA PRIMADAYA (S2P)

Project Name : Reposisi Valve Inlet Dengan Debris Filter 2A & 2B Dan Penggantian Pipa Inlet 2A & 2B Dan Pipa Outlet 2B (Upgrade Material SS316L) – PLTU Cilacap Unit#2.
Location : PT. S2P – CILACAP – JAWA BARAT.
Year : 2022
General Scope :

  1. Engineering
  2. Supply Material SS316L.
  3. Fabricate Inlet & Outlet Condenser Pipe (Diameter 1620mm)
  4. Reposition Inlet Valve with Debris Filter 2A & 2B
  5. Replacement Inlet Condenser Pipe 2A, 2B & Outlet Condenser Pipe 2B (Upgrade Material SS316L)
projects

PT. PETROKIMIA GRESIK (PKG)

Project Name : Reharping Tubes Primary Reformer.
Location : PT. Petrokimia – Gresik.
Year : 2021
General Scope :

Reharping new tube catalyst : 4 rows OR 224 tubes:

  • Cutting and re-welding existing inlet pigtail to new connection pigtail : 224 joint
  • Cutting and re-welding top riser to RTA (Riser Transition Assembly) : 4 joint
  • Welding new Outlet Manifold Header : 8 joint ( supplied on 3 segment / row )
  • Cutting and re-welding existing drain pipe & thermocouple pipe
  • Re-install & re-setting existing spring hanger of tube catalyst
projects

PT JAWA POWER (YTL)

Project Name : Remove & Replace Two Induced Draft (ID) Fans (Unit 6).
Location : YTL-Unit6 – Paiton Probolinggo – Jatim.

Year : 2021

General Scope :

  1. Remove 2 units of existing ID Fan to designated location within Plant, complete with accessories : Rotor; Intermediate Casing; Intermediate Shaft; Hydraulic/lube oil unit; Seal air fan & Piping and ducting
  2. Remove 2 units of existing ID Fan Motor.
projects

PT. Jawa Power (YTL)

Project Name : 2 Yrs Maintenance – Inspection And Repair Of Pulverizer Dampers & Gates and Replacement of BWCP.
Location : YTL – U56 – Paiton Probolinggo – Jatim.
Year : 2021 – 2022


General Scope :

  1. Internal and External Inspection of Pulverizer Hot Air Dampers and Gates.
  2. Internal and External Inspection of Pulverizer Cold Air Dampers and Gates.
  3. Include replacement (with new parts, if necessary)
projects

PT. Jawa Power (YTL)

Project Name : Mechanical Installtion of Sootblower.
Location : YTL – U56 – Paiton Probolinggo – Jatim.
Year : 2021-2022

General Scope :

  1. Install 10 units of Diamond Sootblower IK 545 for U#5
  2. Install 16 units of Diamond Sootblower IK 545 for U#6
projects

PT. Jawa Power (YTL)

Project Name : Boiler Services for RSH unit 5 (Force Outage).
Location : YTL – U56 – Paiton Probolinggo – Jatim.
Year : 2021

General Scope :

  1. De-slagging at SH Div. Panels; SH vertical plated and RH vertical front platen
  2. Install scaffolds on Upper Furnace dan Bottom Slope
  3. Inspection of Pressure Part at Upper Furnace and Bottom Slope
  4. Repair Damaged Tubes at Bottom Slope, Furnace Water Wall and Nose.
projects

PT Pupuk Kalimantan Timur (PKT)

Project Name : Repair Crack Hp Stripper DA-101 – Pabrik#5
Location : PT. PKT – Bontang – Kalimantan Timur.
Year : 2021

General Scope :
Remove and Re-Weld Protrusion Weld tube to tube sheet (1000 tube) 

projects

PT SUMBER SEGARA PRIMADAYA (S2P)

Project Name : Replacement internal part of ESP Unit#1.
Location : PT. S2P– CILACAP JAWA BARAT.
Year : 2020

General Scope :

  1. Replacement and modification of Hanger RDE Field 1 & 2.
  2. Replacement two, Three & four Rollers bearing for shaft hammer collecting and emitting.
  3. Replacement Pin wheel for field 1 & 2.
  4. Replacement Collecting & Emitting Hammer.
  5. Repair support Emitting (Double frame emitting)
projects

PT SUMBER SEGARA PRIMADAYA (S2P)

Project Name : Cleaning Air Heater Basket (Total 1536).
Location : PT. S2P–– CILACAP JAWA BARAT.
Year : 2020


General Scope :

  1. Dismantling AH Basket.
  2. Washing AH Basket with High Pressure Pump.
  3. Re-Install AH Basket.
projects

PT. Pupuk Kalimantan Timur (PKT)

Project Name : Replacement Reformed Gas WHB (E-0208) Ammonia Pabrik 1A.
Location : PT. PKT – Bontang – Kalimantan Timur.
Year : 2020


General Scope :

  1. Remove & Install castable & Insulation.
  2. Remove & Install Platform & Accessories.
  3. Remove & Install Steam Drum.
  4. Replacement Reformed Gas WHB (E-0208 w/ New) Ammonia Pabrik 1A.
  5. Remove & Install Pipe Line System.
projects

PT. Pupuk Kalimantan Timur (PKT)

Project Name : Replacement Tier (Inlet & Outlet) & Bull Gear Unit M-2102 & M-2105.
Location : PT. PKT – Bontang – Kalimantan Timur.
Year : 2020


General Scope :

  1. Replacement Tier (Inlet & Outlet).
  2. Replacement Bull Gear.